Notes on substation yards, passes and change lists.
Nov 16, 2026Field notes: the Saturday our own crew added a bay and the quarterly pass almost missed itA planning analyst on catching unannounced construction from your own utility's field crews, not just a neighboring one.
Nov 16, 2026Network upgrades in the interconnection queue: why they start at the substationA plain explanation of what a network upgrade means in an interconnection queue study, and why the first physical evidence shows up at a substation yard.
Nov 9, 2026How to find substation upgrade plans buried in a rate case filingA field guide to finding substation capex buried in rate case exhibits, workpapers, and DR responses, and telling capacity adds from replacement-in-kind.
Nov 9, 2026Control house or relay house: reading rooflines in substation imageryHow to tell a new control house from a relay building in satellite imagery, using footprint size, roofline detail, and cable trench patterns.
Nov 2, 2026Field notes: three new bays, zero new filingsA field-notes look at why substation construction often outruns the interconnection filing record, and what that lag costs transmission planners.
Nov 2, 2026Spotting new bay additions before the interconnection filing goes publicA field-level look at how to catch bay additions and yard expansion at a substation months before the interconnection filing shows up in the queue.
Oct 26, 2026Dead-end structures: why they're the tell for a new line tie-inWhat a dead-end structure is, how it differs from a tangent tower, and why a new one in imagery usually means a transmission tie-in is coming.
Oct 19, 2026Capacitor bank vs reactor bank: telling them apart in satellite imageryHow to tell capacitor banks from reactor banks in VHR satellite imagery, using footprint shape, clearance and switching gear as the tells.
Oct 19, 2026Field notes: the yard that doubled before anyone filedA field note on why substation yards grow for months before any interconnection filing catches up, and what to watch for instead.
Oct 14, 2026How long does it take to build a new substation bay?A breakdown of substation bay construction timelines, from site clearing through energization, and why the schedule rarely holds.
Oct 14, 2026SVC yard vs. transformer yard: what to look for in overhead imageryHow to tell an SVC yard from a transformer yard in VHR satellite and aerial imagery, by equipment shape, layout and shadow.
Oct 13, 2026Construction or teardown? Reading a substation site from the airHow to tell whether a substation footprint in satellite imagery is being built out or torn down, using the visual cues that show up pass to pass.
Oct 13, 2026Ring bus or breaker-and-a-half? Reading the configuration off the yardHow to tell a ring bus from a breaker-and-a-half layout using aerial imagery, and why the configuration matters for capacity headroom.
Oct 7, 2026GIS vs AIS substations: reading switchgear footprint from aboveHow GIS and AIS substations read differently in satellite and aerial imagery, and what to watch for when tracking capacity changes at each.
Oct 7, 2026How to read an interconnection queue reportA line-by-line guide to queue position, study phase and status codes in an interconnection queue report, and where the report stops telling you anything.
Oct 7, 2026Transformer addition or bay extension? How to read substation imagery rightHow to tell a new transformer from a bay extension in satellite imagery, using pad shape, containment rings, and bus structure as the tells.
Oct 7, 2026What is a bay in a substation, and why planners count themA plain-language breakdown of substation bays, breaker-and-a-half configuration, and why bay counts matter when tracking capacity build-out.